THANK YOU!

OGA has been a wonderful and inspiring learning experience for all of us at alliance sealand. we would like to give our thanks to the following (in no particular order):

EIC, MOGSC
ORGANIZER (ASPRI, INFORMA)
FRIENDS IN THE INDUSTRY

Involved in one of the first large scale decommissioning campaign in Gulf of Thailand

Alliance Sealand Equipment Solutions, exclusive agent for Balltec, will showcase our products and services, with a focus on decommissioning and renewables.

    Follow us on Linkedin for updates

    Presentation

    Singapore Pavilion ASES Booth 4208
    2pm, Thursday
    >>>>

    Safety and efficiency in Offshore Lifting

    CONTACT US

    ON WHATSAPP TO ARRANGE FOR A MEETUP DURING OGA

    Gerrard
    +6590117531
    Nazri
    +6584173669

    Pipeline Solutions

    Balltec pipeline solutions has an unrivalled track record of pipeline solutions including the development of tooling and systems in pipeline recovery, pipelay, infrastructure upgrades, IRM, emergency repair and decommissioning.

    Balltec PipeLOK

    PipeLOK™

    Balltec PipeLOK™ tools offer a highly robust, fast and 100% reliable method of both abandoning and recovering subsea pipelines at ANY water depth. Balltec designs and tests tools suitable for ANY pipe diameter.

    Lifting Solutions

    Balltec lifting solutions delivers innovative lifting and handling systems for complex engineering projects. Balltec has provided lifting solutions across multiple engineering disciplines and industries.

    Balltec LiftLOK

    LiftLOK™

    Balltec LiftLOK tools provide a simple, robust, high capacity method for connecting and disconnecting heavy loads to and from lifting devices. As a purely mechanical device, containing no hydraulics and requiring minimum ROV intervention, LiftLOKTM products are ideally suited for the deployment and retrieval of equipment to and from the ocean floor.

    Current Projects

    Decommissioning in Thailand

    One of the first large-scale decommissioning campaigns in Southeast Asia faced significant engineering challenges, particularly with highly corroded jacket leg interfaces and jacket leg batter angles of up to 10 degrees. The operation required a tool capable of functioning in exceptionally tough conditions, safely lifting structures in a highly corrosive environment. Despite these challenges, the tool demonstrated impressive efficiency, minimizing downtime for configuration changes and ensuring safe, reliable performance throughout the campaign.

    Well done, team!

    Pin It on Pinterest

    Share This